Exploration domain:
  Completion of exploration operation in north-west of country in particular exploration of Iron and poly metal with the priority of Copper and Gold by using advanced methods, recognition and registration of mining and mineral potentials. 
   Performance of final exploration operations for Ahmad Abad, Khedergoran-Zarrin Abad Iron Ore areas
  Planning and systematic exploration of Iron-Copper areas (Chlavan and Astamal) in East Azarbayjan Province, Varzegan, west of Songun Copper Mine (Copper Belt)
   Planning and systematic exploration of poly metal areas (Bashmakh Copper, Gold and Iron-categorized in IOCG orebodies)
   Necessary proceedings for getting exploitation permit of Bardazard Silicon mine, Algo and Buket Limestone mines
   Recognition and registration of Copper Exploration area in Kerman province (Barez Mountains)
   Commencement of systematic exploration stages for Sarab, Damanjan Copper area
   Commencement of systematic exploration stages for Chehregan Sedimentary Copper area

 


Exploitation Domain:
   Commencement of exploitation of Titan-Iron Ore from the mine
   Completion of first phase erection project for limestone plant (grain size distribution and production of micronized limestone), equipping and preparation for exploitation of mine
    Exploitation of Iron and Titanium Ore in Eskandiyan Mine (west Azarbayjan, Sero town)
    Exploitation of Hematite Iron Ore in Dashaghul mine
     Exploitation of Hematite Iron Ore in Mooil mine situated in Meshkin Shahr (for transportation to the concentrate production unit)
    Equipping and preparation for Avan Iron Ore exploitation (east Azarbayjan, Varzegan)
   Equipping and preparation forof Woody-Color Teravertine  exploitation in Tureh mine
    Equipping and preparation for excavation of Coal from Amir Coal Mine (Shahindegh, East Azarbayjan)

 


Processing Domain:
    Completion of concentrate unit for 64% titanium and 63% Magnetite with capacity of 250tons per day adjacent to the Eskandiyan Titan-Iron mine
    Completion of Buket Limestone processing (production of Quick and Hydrated Lime with capacity of 400 tons per day)
   Performance of preliminary stages for Hematite Iron concentrate in Meshkin Shahr
    Commencement of technical and commercial studies for copper concentrate production in Bashmakh, Ghazikandi Copper area
    Planning for erection of Iron concentrate unit (Saggiz, Kordestan Province)